Type | Depot | Survey Date | Cause | Damage Code | Allocated US$ | Manu Date |
45G1 | Terminal | 02/06/2016 | Fire | 1: Light Damage/Cleaning | US$:50.00 |
Damage due fire incident on terminal.
Estimated costs are surveyors own estimate based on local repair costs.
Repairable.
TCNU 640578 [4] ]]>
Type | Depot | Survey Date | Cause | Damage Code | Allocated US$ | Manu Date |
45G1 | Terminal | 01/06/2016 | Fire | 2: Medium Damage | US$:330.00 |